top of page
U-5739.jpg

PT Engineering developed a traffic estimate utilizing the Metrolina Regional Model (MRM) to develop a 2015 Base Year No-Build, 2040 Future Year No-Build, and a 2040 Future Year Build estimate.

bottom of page