top of page
PT Engineering was responsible for developing the traffic operations analysis in TransModeler for the planned addition of an auxiliary lanes between NC 147 and NC 55. The analysis included developing a calibrated model for 2 miles of freeway and 2 interchanges for the 2014 existing, 2040 No-Build and 2040 Build scenarios. Additionally, an interim year analysis was developed for 2025 and 2035 due to the I-40 mainline not being able to accommodate the future year build volumes.
bottom of page