top of page
U-5739.jpg

PT Engineering developed an analysis in TransModeler of the I-277/US 74 interchange area and the adjacent weaving section along I-277 to 4th Street. The study was developed based on the calibrated base year model for the US 74 Corridor (U-5526A). The study evaluated the effect of constructing one of the two alternatives for the proposed U-5526A project combined with a two-lane exit onto the loop to 4th Street. The evaluation included the development of heat maps showing the speed along the corridors for each alternative.

No Available Report
bottom of page