top of page
U-5739.jpg

PT Engineering provided NCDOT Program Management services for the development of microscopic simulation models in TransModeler. The simulation models were used to determine the travel time savings component for scoring in the NCDOT Prioritization Process, SPOT 5.0. PT Engineering was responsible for overseeing the analysis of 300 projects in TransModeler, including the development of influence areas for the projects, scoping of the studies, quality control review of the models and the development of the technical approach for the program. Additionally, PT Engineering developed traffic volumes for 60 projects and simulation models for 22 projects.

No Available Report
bottom of page