top of page
PT Engineering developed a traffic forecast for the proposed widening of US 64 from US 601 south of Mocksville to US 52 in Lexington in Davidson and Davie Counties. The forecast included utilizing the Piedmont Triad Regional Model (PTRM) and North Carolina Statewide Model (NCSTM) output to develop a 2018 Base Year No-Build, 2040 Future Year No-Build, the 2040 Future Year Build forecast for one alternative for 18 intersections.
bottom of page